Inverter Installation | Connect Dedicated Electrical Circuits to Complex lights, Gate Motor, Mag Lock & Intercom system and alarm system

R20,503.35 (Incl. VAT)

Description

Includes:

1 New 5 KVA inverter with lithium battery and weather proof ventilated enclosure to be supplied by WCCTV.
We will install them.
1
2 New single phase cable for connecting of the new 5 KVA inverter in the court yard (the new inverter + battery are supplied by WCCTV). sum
3 Cable terminations to suit. 4
4 By-pass switch single phase 6 terminals with enclosure (for in the event that the inverter becomes damaged or faulty and has to be removed from site). 1
5 DC battery cables x 2 (5 meters red and 5 meters black) 35 mm insulated copper type (per meter). 10
6 Crimp on lugs for DC cables (8 for red cable and 8 for black cable). 16
7 Battery disconnector switch (double pole) with fuses. 1
8 AC cable to DB board (per meter). 10
9 New weather proof DB Board for the new inverter power, complete with it’s own separate main switch, earthleakage, circuit breakers and internal wiring. To be mounted on the wall next to the existing orange LV COMPLEX DB Board (inverter power and municipal power not permitted to be in the same DB Board as per the electrical regulations for alternative power). 1
10 Transferring, extending and connecting of existing circuits that need to be diverted onto the new inverter power DB Board (complex public lights circuits and gate motor, magna lock, intercom & alarm circuits). 6
11 Fixings, screws, cable ties and accessories. sum
12 Trunkings PVC type 100 mm x 40 mm with covers (per linear meter).. 1
13 Earth spike and earth cable (separate earthing system is required for the new inverter/alternative power supply) as per regulations. 1
14 Conduit 20 mm PVC (per length). 4
15 Pilot lights and wiring for visual power indication on DB Board and at meter box (as per the regulations for alternative power installations) 2
16 Surge & lightning protection single phase double pole
(to protect the new inverter).
1
17 Labels and danger signs. sum
18 Labour to install and connect all of the above mentioned new electrical items in the cout yard (labour for the materials that are supplied by us, as well as labour to install and connect the new inverter and lithium battery and weather proof enclosure that is supplied by WCCTV). sum
19 Supervision, transport and fuel. 1
20 Electrical COC for the new installation (for insurance purposes and required by regulations). 1
Please refer to our Privacy Policy
We will send an SMS to this number as soon as your quote is ready.
Provide an additional landline or mobile number to contact you.
Left Menu Icon
Cart Menu Button Image0Right Menu Icon
Your Cart